VA House · HB 1487

Underground transmission lines; pilot program, clarifies qualifying projects, report.

In plain English (AI summary)

This legislation refines the existing pilot program for placing electric transmission lines underground across Virginia. By clarifying the specific criteria for qualifying projects, the bill aims to streamline the approval process for utility companies looking to bury high-voltage lines rather than utilizing traditional overhead poles. For Arlington residents, this move is intended to improve local grid reliability and aesthetics by reducing the risk of power outages caused by storms or falling trees. While undergrounding projects are significantly more expensive than overhead construction, this bill sets clearer guidelines for project eligibility and requires ongoing reporting to state regulators. Ultimately, the measure seeks to balance the high costs of burying infrastructure with the long-term benefits of a more resilient and protected regional energy network.

View original bill

Roll-call votes

Adopt Conference Committee Report
Mar 14, 2026 · VA Senate · pass
28 – 11 · 1 other
Full roll call
Roll call
Mar 14, 2026 · VA House · pass
61 – 36 · 2 other
Full roll call
Insist & Request
Mar 4, 2026 · VA Senate · pass
40 – 0
Full roll call
Roll call
Mar 2, 2026 · VA House · fail
7 – 92
Full roll call
Passage
Feb 26, 2026 · VA Senate · pass
27 – 13
Full roll call
Constitutional reading dispensed (on 2nd reading)
Feb 25, 2026 · VA Senate · pass
40 – 0
Full roll call
Roll call
Feb 16, 2026 · VA House · pass
62 – 36 · 2 other
Full roll call
Reported from Labor and Commerce with substitute
Feb 10, 2026 · VA House · pass
19 – 3
Arlington delegation
Full roll call